Delay Analysis In Construction Contracts by P. John Keane Hardback Book

٤٧٩٫٠٠ ر.س.‏
+ ١١٧٫٤٩ ر.س.‏ الشحن

Delay Analysis In Construction Contracts by P. John Keane Hardback Book

  • العلامة التجارية: Unbranded

Delay Analysis In Construction Contracts by P. John Keane Hardback Book

  • العلامة التجارية: Unbranded
السعر: ٤٧٩٫٠٠ ر.س.‏
البائع:
٤٧٩٫٠٠ ر.س.‏
+ ١١٧٫٤٩ ر.س.‏ الشحن

متبقي في المخزون ٢ فقط

سياسة الإرجاع لمدة 14 يوما

طرق الدفع:

الوصف

Delay Analysis In Construction Contracts by P. John Keane Hardback Book

The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex.
  • العلامة التجارية: Unbranded
  • الفئة: الأعمال والمالية والقانون
  • حَجْم: Hardback
  • اللغة: English
  • المؤلف: P. John Keane
  • عدد الصفحات: 290
  • الناشر/ العنوان: John Wiley & Sons
  • هوية Fruugo: 8131842-17439690
  • ISBN: 9781118631171

التسليم والرد

يُرسل خلال 24 ساعة

  • STANDARD: ١١٧٫٤٩ ر.س.‏ - التسليم بين الأربعاء 31 ديسمبر 2025 – الأربعاء 07 يناير 2026

يُشحن من المملكة المتحدة.

نحن نبذل قصارى جهدنا لضمان أن تصلك المنتجات التي تطلبها بالكامل وطبقاً المواصفات التي حددتها. إلا أنه في حال تلقيك طلب غير كامل أو أغراض تختلف عن تلك التي طلبتها أو كان هناك سبب آخر يدعوك لعدم الرضاء عن الطلب، فيمكنك رد الطلب أو أي منتجات يتضمنها الطلب واسترداد ما دفعته من أجل تلك الأغراض بالكامل. عرض سياسة الرد الكاملة